Learn · Solar
Solar
PV systems from racking to interconnection, and the NABCEP path that certifies you to design and install them.
Learning paths
Just browsing? Start here: How Solar PV Works →
Content
Pv Systems 14 lessons
Fundamentals
- How Solar PV Works
How photovoltaic cells turn sunlight into DC electricity, the physics every installer builds on and the first NABCEP PV Associate exam domain.
- PV System Components
Modules, inverters, racking, and balance-of-system parts: what each component does and how they connect into a working PV system.
- Grid-Tied, Hybrid and Off-Grid Systems
Grid-tied, hybrid and off-grid architectures compared, and why the interconnection choice drives design, code path and equipment selection.
- Inverters: String, Micro, Optimizers
String inverters, microinverters and DC optimizers: how each converts and manages power, and when installers choose one over another.
- Battery Storage Systems
Battery storage for PV systems: chemistries, kWh sizing, coupling options, and the work that leads to NABCEP's Energy Storage Installation Professional certification.
Installation
- Racking and Mounting
Racking and mounting systems for roofs and ground mounts, from layout and structural loads to torque specs and manufacturer listings.
- Roof Attachments and Waterproofing
Roof attachments and waterproofing done right: flashing details, penetration sealing, and the mistakes that cause leaks years later.
- PV Wiring and Rapid Shutdown
DC and AC wiring for PV arrays, wire management, and the rapid-shutdown functionality the NEC requires on buildings.
- Interconnection and Net Metering
Connecting PV to the grid: utility interconnection applications, net metering, and the NEC Article 705 rules for parallel power sources.
- Commissioning and Testing
Commissioning and testing a finished PV system: verification measurements, inspection sign-off, and the documentation that proves it works.
Safety
- Fall Protection on Solar Roofs
OSHA fall-protection requirements for rooftop PV work: the 6-foot construction trigger, anchor points, harness systems, and ladder safety.
- Electrical Hazards in PV Work
Shock, arc flash and thermal burn hazards specific to PV: why arrays cannot be switched off by unplugging, and the lockout and PPE practices OSHA expects.
- OSHA 10 and OSHA 30 for Solar Work
What the OSHA construction outreach cards are, why NABCEP requires OSHA 10 for installer certifications and OSHA 30 for storage and maintenance ones, and why a card is not a certification.
Maintenance
- PV Operations, Maintenance and Troubleshooting
Keeping installed systems producing: performance monitoring, IV-curve and insulation testing, common fault patterns, and the service records that back warranty and certification claims.
Design 5 lessons
Sizing
- Site Assessment and Shading
Reading a site before designing a system: shading analysis, roof condition, orientation, and the measurements that make or break production estimates.
- System Sizing
Sizing a PV system from load data and site conditions: array capacity, inverter matching, and the kW DC versus kW AC decisions designers own.
- NEC Article 690 Compliance
NEC Article 690 for PV systems: conductor sizing, overcurrent protection, grounding, and the code checks an AHJ inspects against.
Codes
- Rapid Shutdown Under NEC 690.12
The rapid-shutdown rules for PV on buildings: initiation devices, controlled conductors, module-level power electronics, and what inspectors test at the array boundary.
- NEC Article 705: Parallel Power Sources
The interconnection article of the NEC: supply-side versus load-side connections, the 120 percent rule, and how Article 705 governs any source operating in parallel with the utility.
Career 7 lessons
- NABCEP PV Associate
The NABCEP PV Associate credential explained: the education, experience and veterans pathways, the 70-question two-hour exam, and the 3-year renewal.
- NABCEP PVIP: The Gold Standard
NABCEP's PV Installation Professional board certification: OSHA 10, 58 training hours, 6 project credits in a decision-making role, and a 4-hour 70-question exam.
- Solar Licensing by State
Who may legally install solar in each state: dedicated solar classifications like California's C-46, statutory categories like Florida's solar contractor, and electrician-track licenses like Oregon's LRT.
- Becoming a Solar Contractor
Going from installer to licensed solar contractor: state license classifications, business and exam requirements, and the scope limits that come with a solar-only license.
- NABCEP Specialist Certifications
The three NABCEP specialist board certifications, PVIS for installation, PVDS for design and PVCMS for commissioning and maintenance, and how their 24-hour training and project-credit requirements differ from PVIP.
- NABCEP Energy Storage Installation Professional
The ESIP board certification for battery storage installers: OSHA 30, 58 hours of advanced ES training, project credits measured in kWh, and the same 70-question 4-hour exam format as PVIP.
- NABCEP PV Technical Sales
The PVTS board certification for solar sales professionals: sales-credit categories, the requirement that at least half of submitted proposals were sold and installed, and its 30-hour recertification cycle.
Credentials in this trade
- OSHA 10-Hour Outreach Card (Construction)
- OSHA 30-Hour Outreach Card (Construction)
- NABCEP PV Installation Professional
- NABCEP PV Associate
- NABCEP PV Design Specialist
- NABCEP PV Installer Specialist
- NABCEP PV Commissioning & Maintenance Specialist
- NABCEP PV Technical Sales Professional
- NABCEP Energy Storage Installation Professional
- Solar Contractor License